GRAFIK Eye® QS Control Unit Quick Installation and Operation Guide 5
Wiring the GRAFIK Eye® QS Control Unit:
Line Voltage Wiring Details (continued)
Step 4: Connect line voltage and loads
to control unit.
• Strip9 in (8 mm) of insulation off the line
voltage/mains cables in the wallbox.
• Connectthelinevoltage/mains,ground,
and load wires to the appropriate
terminals on the back of the control unit.
L: Hot/Live
N:Neutral
: Ground
Terminals 1-6: Dimmed/Switched
line voltage outputs
9 in
(8 mm)
The recommended installation torque is
5.0 in∙lb(0.6N∙m) for line voltage/mains
connections and 5.0 in∙lb(0.6N∙m) for
the earth/ground connection.
Note: See the zone setup section for a
list of compatible load types and
instructions for programming the
GRAFIK Eye® QS control unit to
properly recognize them.
Notice: Risk of damage to unit. GRAFIK Eye® QS control units must be in stalled by a
qual i fied electrician in accordance with all applica ble reg u la tions and building codes.
Im prop er wiring can result in dam age to control units or oth er equipment.
Note: To avoid over heat ing and pos si ble damage to equipment, do not install control
units to dim re cep ta cles, mo tor-op erated ap pli ances, or flu o res cent lighting not
equipped with Lutron Hi-lume®, Eco-10®, Tu-Wire®, electron ic dim ming ballasts, or
other devices approved for your location. In dimmed mag net ic low-voltage cir cuits,
you can pre vent trans former overheating and failure by avoid ing excessively high cur-
rent flow. Do not op erate control units with any lamps re moved or burned out; re place
any burned out lamps imme di ate ly; use only transform ers that in cor po rate ther mal
pro tection or fused pri ma ry wind ings. Control units are de signed for res i den tial and
commercial use, for indoor use only.