User's Manual
SIVOIA QED
TM
Wireless Roller 64 Installation Instructions
8
4
Pre-drill for Cable Run: (continued)
Ceiling Mount
Ceiling Mount with wires through:
A) Wall: 1” in from end of system and .5” from ceiling
B) Ceiling: 1” in from end of system and .5” from back of bracket
C) Jamb: 1” from back of bracket and .5” from ceiling
4.2
Ceiling Mount
ABC