Instructions
9|Page
Installaon
Step 1: The reactor can be installed either horizontally or
vercally using the clamps provided. Vercal installaon is the
preferred method with the inlet at the boom (lamp connecon
at the top) as it allows any air that may be in the lines to be easily
purged from the system.
Step 2: The use of a by-pass assembly is recommended as it will
allow you to isolate the UV reactor. This will allow for easier access
in case maintenance is required (See Figure 4).
Step 3: Fasten chamber clamps to wall with screws provided.
The screws must anchor securely into solid wood, concrete, or steel
structure for adequate strength. Do not aempt to secure screws
into drywall (Figure 3a). Install Chamber into clamps (Figure 3b).
Step 4: For water supplies where the maximum ow rate is
unknown, a ow restrictor is recommended so that the rated ow
of your parcular BLACKCOMB system is not exceeded. The ow
restrictor should be installed on the inlet port of the reactor.
Step 5: It is recommended to have a licensed plumber connect
the UV reactor to the water supply and may be a requirement
depending on where you are located.
leave at least
an addional
reactor length
to facilitate
lamp and
sleeve removal
Figure 2. Lamp
Removal Spacing
Figure 3a. Fasten
clamps to wall
Figure 3b. Install
chamber into clamps
Figure 4. By-pass
assembly
Note: Installaon of your BLACKCOMB disinfecon
**
systems shall comply with applicable provincial/
state & local regulaons.