Owner's manual

4. Vortex the xMAP calibrator, verification, and fluidics containers for 30 seconds to ensure
homogeneity. Do not dilute xMAP calibrator, verification, or fluidics agents.
5. Click Eject on the status bar.
6. Place the off-plate reagent block on the plate holder. Load a strip well into the block.
7. Load wells with at least five drops of the Calibration, Verification, and Fluidics beads, as
indicated on the plate image and in the kit insert instructions.
NOTE: To ensure you get the necessary bead count, invert the calibrator
and verifier vials perpendicular to the plate as you add drops to the
wells. This ensures the maximum fluid drop size is dispensed into
the wells.
8. Click Retract.
9. Click Run.
Run, Save, and Print Reports
xPONENT
®
can provide information in six different report types:
Batch
Protocol
Calibration and Verification
Performance Verification
System Log
Advanced (User)
It can also format your batch or multibatch results in a variety of export formats.
9