Software
Luminex 200 Maintenance Log Month(s): ________________________________________Year:_______________
Procedure: To use this log, fill in the month(s) and year above. This form is designed to record information for four weeks. Make photocopies as necessary. Fill in the dates for which this
log is used in line one of the table below. For each item listed at the left, add your initials under each date you perform the item.
Note: Follow your standard laboratory safety practices when cleaning or maintaining the system. Do not remove the analyzer cover under any circumstances.
Dates
Daily maintenance
Startup Initials: (for each item listed at the left, fill in your initials under each date that you perform the item)
Laser warmup
Check sheath fluid
Check waste level
Tighten sheath cap
Alcohol Flush (70% isopropanol)
Wash twice (distilled water or
sheath fluid)
Shut down Initials: (for each item listed at the left, fill in your initials under each date that you perform the item)
Sanitize (10%-20% bleach)
Soak (water)
Loosen sheath cap
Turn the system off (optional)
Weekly
Visual inspection Date/Initials: Date/Initials: Date/Initials: Date/Initials:
Calibrate Date/Initials: Date/Initials: Date/Initials: Date/Initials:
Monthly
Clean sample probe Date/Initials: Date/Initials: Date/Initials: Date/Initials:
Wipe exterior surfaces Date/Initials: Date/Initials: Date/Initials: Date/Initials:
Every six months
Replace air intake filter, analyzer Date/Initials: Date/Initials: Date/Initials: Date/Initials:
Replace air intake filter, XYP
(optional)
Date/Initials: Date/Initials: Date/Initials: Date/Initials:
Replace syringe plunger seal, or
syringe
Date/Initials: Date/Initials: Date/Initials: Date/Initials:
Check analyzer ventilation filter Date/Initials: Date/Initials: Date/Initials: Date/Initials:
Yearly
Replace sheath filter Date/Initials: Date/Initials: Date/Initials: Date/Initials:
As required
Replace fuses Date/Initials: Date/Initials: Date/Initials: Date/Initials:
Comments:
PN 89-00002-00-150 Rev. A