Installation Guide

ROD INSTALLATION
STEP 5.
Detach finial from inner rod.
STEP 6.
Assemble rod and shirr drapery treatment onto rod.
STEP 7.
Screw finials onto inner rod. Rotate finial on rod for proper
alignment if required.
STEP 8.
Extend rod to desired width and place it into the brackets.
Adjust draperies to desired position.
FINAL ADJUSTMENT
STEP 9.
Secure each rod by tightening screws provided.
Note:
Finial shown is for illustration purposes only.
It may not represent the style of finial purchased.
For larger width windows, two persons may be
required for easier leveling.
Tape Measure, Pencil, Drill & Bit Set, Philipshead
Screwdriver, Level
Tools needed:
Tape Measure
Philipshead
Screwdriver
Drill & Bit SetPencil Level
DRAPERY ROD SET INSTALLATION GUIDE
DRAPERY ROD SET INSTALLATION GUIDE
BRACKET INSTALLATION
STEP 1.
Unscrew the projection screw and remove the front bracket.
Place the base bracket against the wall or ceiling at desired
locations and mark screw holes. Use tape measure and level
to make sure marked screw holes are horizontal to each other.
STEP 4.
Determine projection of brackets. Loosen projection screw,
slide bracket to desire position and tighten projection screw.
Repeat for each bracket.
Pre-drill two pilot holes for each bracket (1/4” drill bit). Screw
anchors into the pilot holes (do not use hammer or tap-in),
and then fasten screws into wall anchors.
STEP 2A. (FOR MOUNTING TO DRYWALL,
CEILING OR PANELING)
Pre-drill two pilot holes for each bracket (1/8” drill bit) and
insert the screws.
STEP 2B. (FOR MOUNTING TO WOOD OR STUDS)
STEP 3.
Insert the brackets through the screws and gently pull
down to tighten the screw against the narrower portion
of the bracket key hole.
STEP 1.
Unscrew the projection screw and remove the front bracket.
Place the base bracket against the wall or ceiling at desired
locations and mark screw holes. Use tape measure and level
to make sure marked screw holes are horizontal to each other.
STEP 4.
Determine projection of brackets. Loosen projection screw,
slide bracket to desire position and tighten projection screw.
Repeat for each bracket.
Pre-drill two pilot holes for each bracket (1/4” drill bit). Screw
anchors into the pilot holes (do not use hammer or tap-in),
and then fasten screws into wall anchors.
STEP 2A. (FOR MOUNTING TO DRYWALL,
CEILING OR PANELING)
Pre-drill two pilot holes for each bracket (1/8” drill bit) and
insert the screws.
STEP 2B. (FOR MOUNTING TO WOOD OR STUDS)
STEP 3.
Insert the brackets through the screws and gently pull
down to tighten the screw against the narrower portion
of the bracket key hole.
BRACKET INSTALLATION
STEP 5.
STEP 6.
STEP 7.
ROD INSTALLATION
STEP 8.
FINAL ADJUSTMENT
36” - 72” 72” - 144”
projection
screw
projection
screw
WOOD
or
STUDS
WOOD
or
STUDS
CEILING MOUNT
DRY WALL
CEILING MOUNT
DRY WALL
front
bracket
base
bracket
front
bracket
base
bracket

Summary of content (1 pages)