Product Manual

B700-INS-LAB-RevC10 11
CABLINGINSTRUCTIONS
plug power cable
into control box
cable-tie
power cable and
pendant cable
to hole in frame
plug pendant cable
into control box
plug head motor cable
into head motor
plug hi/lo motor cable
into hi/lo motor
plug foot motor cable
into foot motor
cable-tie hi/lo and foot
motor cables to underside
of motor guard
cable-tie
control box
to main frame
rail using two
cable ties
run power
cable and
pendant cable
along frame
and under
cross brace;
cable-tie to
cross brace
cable-tie all three motor
cables at control box
FOOT SECTION
cable-tie corner of control
box to hole in main frame
with large cable tie
plug foot motor cable
into control box
plug hi/lo motor cable
into control box
plug head motor cable
into control box
1. Cabling: The cables, shown above, will be installed at the factory on the foot section, as well
as the control box, foot motor, hi/lo motor, and head motor. If you ever need to replace an
electrical component or cabling, follow the diagram above.
sNOTICE:Toavoiddamagetocabling,allcablesmustberoutedcorrectly
andcable-tiedtoproperpartsoftheframeasshown.
cable-tie power cable
and pendant cable
to hole in frame
power cable and
pendant cable
cable-tied to frame
cable-tie
power cable
to hole in frame
cable-tie
power cable
to hole in frame
FOOT SECTIONHEAD SECTION
The head section of the bed does not come with any cable routing. The power cable and
pendant cables will be coiled and cable-tied to the foot section in packaging. To route the
power cable and pendant cable:
2. Cut off the cable ties from the coiled sections.
3. Run the cables along the inside and underside of the main frame rails with the pendant run-
ning out the center of the bed and the power cable running off the end of the head section
toward the wall outlet.
4. Cable-tie the power cable and the pendant cable to frame rail holes in areas indicated above
to prevent pinching of cables or interference with normal bed functions.