Service Manual User guide
Axles and Brakes
31200079
9-15
Fig. 9-4: Accumulator Charging
Pre-charge the accumulator using the following steps (see Fig. 9-4):
1. Follow preparation procedures as outlined in Section 3 and in
Section 5 of this manual.
2. Make sure nitrogen supply is shut off.
3. Attach hose (Item 7) to nitrogen bottle.
4. Remove two (2) capscrews (Item 1), valve guard (Item 2), and gas
valve cap (Item 3).
5. Back âTâ handle (Item 8) on accumulator test gauge (Item 5) all the
way out (counterclockwise). The pressure gauge must have 2500 psi
capacity (correctly calibrated).
6. Mount test gauge on accumulator gas valve (Item 9) and tighten. Be
sure of an air-tight connection when mounting gauge.
7. Close (turn in) bleed valve (Item 4).
8. Remove gauge cap (Item 6) from test valve.
9. While making sure not to loop or twist the hose, attach swivel nut on
nitrogen hose (Item 7) to gas valve.
K1018
1
# Description
1Capscrew
2 Valve Guard
3 Gas Valve Cap
4 Gauge Bleed Valve
5 Accumulator Test Gauge
# Description
6 Gauge Cap
7 Nitrogen Hose
8 âTâ Handle
9Gas Valve
10 Accumulator
2
3
5
6
7
8
10
4
K1018
9