User guide

16
4.4 Example scenario 2 - Two point lifting
Two point lifting is carried out by the assisting train manager if he considers the situation
of the rail-bound vehicle to be unstable, or if the rerailing concept provides for this. The as-
sisting train manager assesses the damage situation and has the equipment and devices
positioned according to their intended purpose.
Item No. Product Number
70-10-30 PC 650-2POWER electric motor 230V / 50 Hz 1
8411720043 10 litres hydraulic oil VG-10 2
70-63-01 Pair of hoses 10 m control table-traversing cylinder 1
70-63-01 Pair of hoses 10 m control table-locking pin 1
70-63-01 Pair of hoses 10 m control table-lifting cylinder 2
70-20-10 Control table CU 2DV, including support frame 1
840724665N Cylinder HP10/T280R 2
840723765N Cylinder HP25/T 450R 2
84072466548 Piston plate for round piece r 40 mm 2
841281319 Foot-plate Alu HP 10 / HP 25 4
840728863 Step set for HP 10/T...HP or 25/T... 2
70-30-10 traversing unit TC170/90-350, anchor hydraulic 1
840720640 Rolling carriage RC700/350 2
LKHR840720571 Connecting rods1030-1800 1
LKHR840720575 Connecting rods1500-2800 1
840725750 Rerailing bridge 2.2m x 140mm x 350 mm 2
840726555 Connecting element 140mm 1