User guide
10
Single point lifting is carried out by the assisting train manager if rail-bound vehicles have
only been derailed slightly at the front and a suitable lifting point is available. The rear axle,
or the bogie, should still be on the rails to provide stability.
The assisting train manager assesses the damage situation and uses the equipment in
accordance with their intended use, or has them distributed.
4.2 Example scenario 1 - Single point lifting
Item No. Product Number
70-10-30 PC 650-2POWER electric motor 230V / 50 Hz 1
8411720043 10 litres hydraulic oil VG-10 2
70-63-01 Pair of hoses 10m control table-traversing cylinder 1
70-63-01 Pair of hoses 10m control table-locking pin 1
70-63-01 Pair of hoses 10 m control table-lifting cylinder 1
70-20-10 Control table CU 2DV, including support frame 1
840723765N Cylinder HP25/T 450R 1
841281319 Foot-plate Alu HP 10 / HP 25 1
840728863 Step set for HP 10/T...HP or 25/T... 1
70-30-10 Movement unit TC170/90-350, anchor hydraulic 1
840720640 Rolling carriage RC700/350 1
840726350 Rerailing bridge 1.1m x 140mm x 350mm 1
840725750 Rerailing bridge 2.2m x 140mm x 350mm 1
840726555 Connecting element 140mm 1