Manual

14
6.1 Installation
6.2 Commissioning
WARNING / CAUTION / ATTENTION!
The LUKAS Mini electric pump is not explosion protected!
When using the equipment in explosion risk areas you must make sure that
operation of the unit does not trigger an explosion!
The unit is to be set up in a suitable location (safe location / at surface / suf cient distance
from vehicles, loads, sources of ignition, etc.).
LUKAS units work perfectly at an angle of up to 20°. However, in order to guarantee maximum
safety and uid withdrawal, they should be operated in as horizontal a position as possible.
The P600OE is designed in such a way that, when deactivated and with correctly tted ller
cap, no hydraulic uid can leak out, even if the pump were to tip over.
Commissioning procedure:
1. First check the condition of the pump.
- The casing should not be damaged.
- Hydraulic uid should not be coming out in an uncontrolled manner.
- The coupling should not be damaged
- The battery connection slot should not exhibit any function-inhibiting damage.
2. Then check the level of hydraulic uid in the in the pump.
The uid levels can be read off on the ll level indicator on the side of the unit. There are
3 marks on the ll level indicator. For precise reading off of the uid levels and for lling,
the hydraulic unit should be as level as possible.
6. Set-up and start-up
Before starting up for the rst time, the battery (if tted) must be fully charged in an external
charger.
NOTE:
When delivered the hydraulic uid in the P600OE has a special High-Tech
running in additive mixed in. This can be seen with the different colour of the
hydraulic uid when the pump is delivered.
The additive optimises the running-in behaviour and the hydraulic function of the
pump. When topping up or lling with hydraulic uid, you should always observe
Item 12.3 in this manual.