Operating Instructions
Table Of Contents
- 1 Supply
- 2 Safety
- 3 Product
- 4 Charging process
- 5 Operation
- 6 Disposal and recycling
- 7 Maintenance/problem treatment
- 8 Technical data
- 9 Warranty
- 10 Standards/regulations
Operation
5 - 23
LUDWIG HOOK / 06/10/2020 / Ludwig System GmbH & Co KG; 83435 Bad Reichenhall, Germany / Tel.: +49 8651 7656730
5.8.2 Group actuation
Push the operating button (A) and then the group button (C) within 0.5
secs.
Result: All the hooks on the LUDWIG HOOK release the load with a
delay of approx. 2 secs.
Image 5-26 Group actuation
A
C