Operating Instructions
Table Of Contents
- 1 Supply
- 2 Safety
- 3 Product
- 4 Charging process
- 5 Operation
- 6 Disposal and recycling
- 7 Maintenance/problem treatment
- 8 Technical data
- 9 Warranty
- 10 Standards/regulations
Charging process
4 - 1
LUDWIG HOOK / 06/10/2020 / Ludwig System GmbH & Co KG; 83435 Bad Reichenhall, Germany / Tel.: +49 8651 7656730
4 Charging process
4.1 Chargers
Use the charger provided to charge the batteries (see chapter 1 “Scope of
supply for the LUDWIG HOOK System” on page 1 - 1).
4.2 Charging process
HINWEIS
m
HINWEIS
m
HINWEIS
m
NOTICE
HINWEIS
Low charge level.
Low charge level can be detected by a red flashing LED.
Measures:
• Charge LUDWIG HOOK as quickly as possi-
ble!
HINWEIS
m
HINWEIS
m
HINWEIS
m
NOTICE
First charge/after being in storage.
The batteries must be charged before commissioning
for the first time and after being in storage for an
extended period (see chapter 2 “Danger of fire/damage
caused by deep discharge” on page 2 - 17)!