Installation Guide

Product Information | 7
Apply adhesive
following manufacturer’s
instructions.
After sucient open time,
begin laying the tile at the
intersection of the working
lines, making sure the tile is
squarely on the lines.
Press tiles rmly against
adjoining tiles and lay row
by row or in a pyramid
fashion. Press rmly into
adhesives.
4
6
5
8 9
If a seam is required,
position the tiles by
overlapping the seam
esges with a matching
patterns.
With a straight edge and
a sharp utility knife, cut
through both layers of
ooring material (double-
cut) at the designated
match point.
Fold back about 8” of the vinyl on
one side of the seam and apply a
small bead of sealer to one edge of
the vinyl that is on the oor. Tuck
seams togethers and wipe o extra
sealer with a clean, damp cloth.
7
11
10
12
Roll entire installation with
a minimum of 100-pound
three-section oor roller.
Use a resilient ooring hand
roller to squeeze out any
remaining sealer and allow
to dry (approx 6 hours).