Use and Care Manual
Product Information | 3
exposed to temperatures less than 40°F for
more than one hour, an additional 4 hours
of acclimation is required at the preferred
temperature.
•
Install the product only after the jobsite has been
cleaned and cleared of other trade apparatus
that may damage a nished tile installation.
•
Use we will specify adhesive
with this product.
NOTICE
Commercial glue down LVT is not
recommended for: outdoor installations,
showers, counter tops.
II. SUBFLOOR INFORMATION
• Careful and correct preparation of the suboor
is a major part of a satisfactory installation.
Roughness or unevenness of the suboor will
telegraph through the new oor covering,
resulting in an unsightly surface and excessive
wear on high spots. The atness of wood
suboors or underlayments must not exceed
on variation of 1/4” in 10 feet (1/2cm in 3 meters).
•
All suboor/underlayment patching must be
done with a non-shrinking, water-resistant
Portland cement patching compound.
•
Never install commercial glue down LVT over
residual asphalt-type (cut back) adhesive. It can
bleed through the new oor covering. Residual
asphalt type adhesive must be completely
removed and covered with underlayment.
•
Floor must be clean, smooth, at and dry. Remove
all foreign substances such as wax, grease, dirt,
construction marks and contaminants, and any
substance or chemical that would interfere with
a good bond. Avoid using sweeping compounds.
Do not install over substrates that have been
chemically cleaned.
UNDERFLOOR HEATING NOTICE
Underoor heating is possible with
warm water heating systems.
For other underoor heating systems/
mats, check with the underoor
heating manufacturer.
Before tting, please conrm suitability
and their guarantee. The temperature
of the oor surface must not exceed
85°F (29.44°C) at any point.
•
Before installing over newly constructed radiant
heat systems, operate the system at maximum
capacity to force any residual moisture from the
cementitious topping of the radiant heat system.
Moisture emission from suboor cannot exceed
3 lbs. per 1,000 sq. ft. per 24 hours as measured
with the calcium chloride test in accordance with
ASTM F1869-04 or ASTM F2170 In-Situ Relative
Humidity not to exceed 75%.
• Turn the heat o for 24 hours before, during and
24 hours after installation when installing over
radiant heated suboors. Failure to turn the heat
o may result in signicantly shortened working
time of the adhesive.
•
Make sure that the temperature in the room is at
least 65°F (18°C) during installation.
• Floor temperature must not exceed 85°F (30°C).
•
Once the installation has been completed,
the heating system should be turned on and
increased gradually (5 degree increments) until
returning to normal operating conditions.
• Refer to the radiant heat system’s manufacturer
recommendations for additional guidance.
•
Failure to strictly follow adhesive manufacturer’s
guidelines may result in failure and void the
warranty.
ELECTRIC HEATING MATS NOTICE
Electric heating mats that are not embedded
into the suboor are not recommended for use
below the oors.
• Using electric heating mats that are
not embedded and applied directly
underneath the oors could void the
warranty for your oor in case of failure.