User manual
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si 
555-230-127  
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-320CO-TRK (CO Trunk) 
10
7, FAIL The conference capabilities of the port failed (Error Code 7).
129,  The reflective 404-Hz Tone Test failed. No transmission was detected to or 
from the port (Error Code 129).
131, or  The reflective 1004-Hz Tone Test failed. No transmission was detected to or 
from the port (Error Code 131).
133 The reflective 2804-Hz Tone Test failed. No transmission was detected to or 
from the port (Error Code 133).
FAULT ISOLATION: Proceed as follows unless power or tone problems are 
suspected (see notes on the next page).
1. To make sure the problem is on-board, disconnect the port from the CO 
and retry the test. Coordinate this with the CO, or do it after busy hours; 
otherwise, the CO may put the connection out of service.
2. If the retry fails, replace the circuit pack.
3. If the retry passes and no troubles have been reported, disable the test. If 
the retry passes and troubles have been reported, refer the problem to 
the CO.
NOTE:
If the loop around and conference circuit test fails for all ports on a 
circuit pack, a -5 volt power problem is indicated. If a TN736 or TN752 
power unit circuit pack is present, either the 631DB AC power unit or 
the 676B DC power unit may be defective. (The 631DB power unit is 
used in a medium cabinet powered by an AC source. The 645B power 
unit is used in a medium cabinet powered by a DC power source.) The 
system may contain a TN736 or TN752 power unit circuit pack or a 
631DB AC power unit, but not both types of power units. To investigate 
problems with a 631DB AC power unit, refer to the CARR-POW (carrier 
port power unit for AC-powered systems) Maintenance documentation. 
To investigate problems with a 645B DC power unit, refer to the 
CARR-POW (carrier port power unit for DC-powered systems) 
Maintenance documentation. If a red LED on TN736 or TN752 power 
unit circuit pack is on, replace the pack. If the test fails on more than 1 
port, check for errors on the TONE-BD or the TONE-PT. If errors, take 
appropriate actions. When the tone errors are cleared, rerun the test. If 
the test fails again, see FAULT ISOLATION above.
PASS CO Trunk Loop Around and Conference Test is successful. User-reported 
troubles on this port should be investigated by using other port tests and by 
examining trunk or external wiring.
Table 10-104. TEST #33 Loop Around and 
Conference Circuit Test — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










