User manual
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si 
555-230-127  
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-133ASAI-EPT 
10
1141 ABORT The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL maintenance documentation.
1144 ABORT The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the PPN.
2. Execute the test port long PCSSpp command and review the results of 
the BRI Port Local LAN Looparound Test to verify the repair.
2012 ABORT Internal system error
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1113 FAIL The signaling link is not "bound" to the adjunct. For ASAI adjuncts this error 
indicates that the link is disconnected at Layer 2. Since the signaling link 
associated with the endpoint has been identified by administration, the link 
is only "unbound" from the endpoint when it is disconnected.
1. Execute the status bri-port PCSSpp command and refer to the 
associated procedures for this command contained in “BRI-PORT”.
PASS The signaling link is connected at Layer 2 and "bound" to the ASAI adjunct.
Table 10-46. TEST #626 Signaling Link Status Test — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










