User manual
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si 
555-230-127  
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids 
Page 8-348test hardware-group 
8
Setting the Test Parameters
Once the user has entered the desired action (test hardware-group) and the 
object (board, carrier, etc.), then an options form displays.
TTI If the test hardware-group command is issued with the 
all-ports
option when the TTI background task is active, some 
unadministered ports may not be tested. In addition, active alarms 
on line ports may be cleared by this task. The status tti command 
can be used to determine the state of the TTI background task.
Add Station If a add station command is entered for an untranslated port at the 
same time as it is being tested as part of the test hardware-group 
command with the 
all-ports
 option, the error message, Object in 
use; please try later
 displays, and the request fails.
Trunk 
administration
If an attempt is made to add an unadministered trunk port to a trunk 
group at the same time as it is being tested as part of the test 
hardware-group with the 
all-ports
 option, the error message, 
Object in use; please try later displays, and the request fails.
Save translation If the test hardware-group with the 
all-ports
 option while a 
translation save operation is active, some unadministered ports 
may not be tested. All other hardware are tested normally.
Hardware alarms When a hardware error is detected by the test hardware-group 
command, the hardware goes through the standard escalation 
strategy. Alarms are raised on hardware that manifest ’hard’ errors. 
This alarming strategy is the same, regardless of whether the ports 
are translated or not.
System interaction The performance of test hardware-group is affected by call 
processing traffic, administration activity, choice of the 
short
 or 
long
 option, whether the 
all-ports
 option is chosen, whether the 
spe-interchange
 option is chosen, and other demand maintenance 
activity.
Scheduled and 
periodic 
maintenance
While executing the test hardware-group command, all scheduled 
background maintenance, periodic background maintenance, and 
data audits activity is suspended until the command completes. 
When the test hardware-group command is canceled or 
completes, all suspended periodic, scheduled, and data audits 
background maintenance activity are restarted where it left off.










