User manual
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si 
555-230-127  
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-1558XXX-BD (Common Port Circuit Pack) 
10
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
Control Channel Loop Around Test
, for example, you may also clear errors 
generated from other tests in the testing sequence.
a. Only applicable to Analog Line circuit packs.
b. Only applicable to TN746 and TN769 Analog Line circuit packs.
NPE Audit Test (#50)
The system sends a message to the on-board microprocessor to update the 
network connectivity translation for all the Network Processing Elements (NPEs) 
on the circuit pack.
1. D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
 Reset Board 
Sequence D/ND
1
NPE Audit Test (#50) X ND
Ringing Application Test (#51) (a) X X ND
Control Channel Loop Around Test (#52) X X ND
SAKI Sanity Test (#53) X D
Neon Test (#220) (b) X X ND
Table 10-526. TEST #50 NPE Audit Test 
Error 
Code Test Result Description/ Recommendation
none or 
2100
ABORT System resources required for this test are not available.
1019 ABORT Test already in progress.
FAIL Internal System Error.
1. Retry the command at one-minute intervals a maximum of five 
times.
2. If the test continues to abort, escalate the problem.
PASS The circuit pack’s NPEs have been updated with their translation.
Continued on next page










