User manual
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si 
555-230-127  
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-1290TBRI-PT (TN2185 ISDN Trunk-Side BRI Port) 
10
A looparound test is performed across the Packet Bus for the D-Channel. The 
switch sends data over a packet connection, which is looped back by the BRI 
port (D-Channel) and received back by the switch. The test passes if the packet 
connection can be established and the transmitted data is received unaltered. 
The test aborts if the Packet Bus is alarmed in the Processor Port Network (or the 
port network in which that circuit pack resides) or if the Packet Interface board is 
out-of-service. The test fails due to either on-board faults associated with the BRI 
port hardware on the circuit pack or problems with the LAN bus.
Table 10-444. TEST #618 BRI Port Local LAN Loop Around 
Error 
Code
Test 
Result Description/ Recommendation
1015 ABORT The port is not out-of-service.
1. Use the status bri-port PCSSpp command to determine the status of 
the port.
2. If it is in use, wait until it is idle, and then use the busyout port 
PCSSpp command to place it in the out-of-service state and repeat 
this test.
!
CAUTION:
Since the busyout command is destructive, execution of this 
command prior to the port being idle causes all calls 
associated with the BRI port to be torn down.
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. Run the test port long PCSSpp command and verify the repair by 
viewing the results of the BRI Port Local LAN Looparound Test (#618).
1141 ABORT The PKT-CTRL is out-of-service.
1. Follow the repair procedures for the PKT-CTRL.
2. Run the test port long PCSSpp command and verify the repair by 
viewing the results of the BRI Port Local LAN Looparound Test (#618).
1144 ABORT The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. Run the test port long PCSSpp command and verify the repair by 
viewing the results of the BRI Port Local LAN Looparound Test (#618).
2012
2100
ABORT Internal system error
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page










