User manual
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si 
555-230-127  
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-1203SW-CTL (Switch Control) 
10
Notes:
a. Refer to DATA-BD (Network Control Circuit Pack) Maintenance 
documentation for a description of these tests.
b. Refer to DATA-CHL (Network Control Channel) Maintenance 
documentation for a description of these tests.
Control Channel Interface Test (#92)
Loop back messages are sent to the Switch Control via the interface used for 
control channel messages. The messages are returned to the SPE for verification 
via the same interface.
Table 10-414. TEST #92 Control Channel Interface Test 
Error 
Code
Test 
Result Description/ Recommendation
2012 ABORT Internal system error
2013 
2100 
none
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1029 
2014 
2015 
2016 
2017 
2018 
2020 
2022 
2024 
2025 
2051
ABORT Refer to STBY-SPE for a description of these error codes.
Continued on next page










