User manual
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si 
555-230-127  
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-683HYB-LINE (Hybrid Line) 
10
Hybrid Circuit and Conference Circuit Test (#57)
This test checks the amount of reflection from the Hybrid loop around circuitry 
and a Conference Test. Please be aware that if no station is connected to the 
port being tested, the results of the test are not valid. The Tone-Clock circuit pack 
places a 1004-Hz tone on a time slot that the port circuit is listening on. A GPTD 
is connected to another time slot that the same port circuit is talking on. The 
on-board microprocessor places the port in the loop around mode and the GPTD 
measures the level of the reflected signal.
The Conference Test is performed after the Circuit Test. The Conference Circuit 
Test verifies that the NPE is able to listen to several test tones and correctly 
conference them together. The test is executed in two parts. The first half of the 
test checks the operation of the NPE’s first three conference channels. The NPE 
is put in the loop around mode and instructed to talk on a selected time slot and 
listen to the 1004-Hz tone using the first three Conference Channels. The signal 
level and noise level of the conferenced output are then measured using a GPTD 
and checked to verify that they are within an acceptable range.
The second half of the Conference Test checks the operation of the NPE’s 
remaining four Conference Channels and follows the same procedure as the 
preceding paragraph.
0NO 
BOARD
The test could not relate the internal ID to the port (no board). This could 
be due to incorrect translations, no board is inserted, an incorrect board is 
inserted, or an insane board is inserted.
1. Check to ensure that the board translations are correct. Use the list 
config command, and resolve any problems that are found.
2. If the board was found to be correctly inserted in step 1, issue the 
busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board long command. This should re-establish the 
linkage between the internal ID and the port. If this is not the case, 
dispatch to check to ensure that there is a valid board inserted.
Table 10-227. TEST #56 Hybrid Electronic Power Feed Test — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










