User manual
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si 
555-230-127  
Issue 1
August 1997
Maintenance Object Repair Procedures 
Page 10-636EXP-INTF (Expansion Interface Circuit Pack) 
10
3 FAIL The reset over the optical fiber failed.
1. Execute the test board PCSS command on the PPN neighbor 
Expansion Interface circuit pack located on the opposite end of the 
fiber from this Expansion Interface circuit pack. If Test #238 does not 
pass, follow the maintenance procedure associated with this test 
result. Then perform the reset again.
2. If the Expansion Interface circuit pack is in the EPN, temporarily 
remove the EPN Maintenance circuit pack.
3. Repeat the reset board PCSS command.
4. Reinsert EPN Maintenance circuit pack if it was removed.
5. Follow the procedure described in the "Relationship Between 
Expansion Interface and Tone-Clock Circuit Packs" section if the 
symptoms match those described there.
6. Check the Hardware Error Log for the EPN Tone-Clock errors that were 
resolved about when the EPN went down. These EPN Tone-Clock 
errors may have been resolved BECAUSE the EPN went down. When 
there is no Tone-Clock generating the system clock on an EPN, then 
an Expansion Interface circuit pack can only be reset once. All 
subsequent reset attempts fail. It is also possible that the system itself 
may have already tried to reset the Expansion Interface circuit pack. 
Refer to the TONE-BD (Tone-Clock) Maintenance documentation for 
recommended maintenance strategy for Tone-Clock problems.
7. If the reset still fails, execute the Manual Loop Back Procedure on the 
opposite PPN Expansion Interface circuit pack. This procedure is 
described in the section preceding the "Hardware Error Log Entries 
and Test to Clear Values" table for this MO. If the Expansion Interface 
circuit pack and the lightwave transceiver are healthy, the problem 
must lie with the Expansion Interface circuit pack and its lightwave 
transceiver on the EPN end of the fiber or with the fiber itself. Test the 
EPN Expansion Interface circuit pack with the manual loop back 
procedure and investigate the test results.
Table 10-215. TEST #336 Expansion Interface Reset Test — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










