User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123 
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids 
Page 8-583test environment 
8
For the following output example, assume that the command that was entered 
was "test environment 2" where cabinet 2 is an SCC cabinet.
Feature Interactions
The long test will recycle power in some specified cabinet on non-SPE and 
maintenance board carriers and is destructive. Specifically, the ’a’ carrier of 
PPNs and EPNs does not have power recycled. In PPNs containing duplicated 
SPEs the ’b’ carrier also does not have power recycled.
All port carriers are recycled, and service is interrupted for each port carrier. If a 
carrier containing an active EI is recycled, communications with that cabinet will 
be disrupted. If a carrier containing an active tone-clock board is recycled, all 
ports in the cabinet or port network will have service disrupted.
 test environment 1
 TEST RESULTS
 Port Maintenance Name Alt. Name Test No. Result Error Code
 01 POWER 5 PASS
 01 AC-POWER 79 PASS
 01A CARR-POW 127 PASS
 01B CARR-POW 127 PASS
 01C CARR-POW 127 PASS
 01D CARR-POW 127 PASS
 01E CARR-POW 127 PASS
 01 EMG-XFER 124 PASS
 01 CABINET 122 PASS
 01 EXT-DEV 120 PASS
 01 RING-GEN 118 PASS
 Command Successfully Completed
 test environment 2
 TEST RESULTS
 Port Maintenance Name Alt. Name Test No. Result Error Code
 02 DC-POWER 5 PASS
 02 EMG-XFER 124 PASS
 02 EXT-DEV 120 PASS
 02 RING-GEN 117 PASS
 02 RING-GEN 118 PASS
 Command Successfully Completed










