User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123 
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids 
Page 8-300release sp-link 
8
If all of the available maintenance resources are currently in use, then the 
following message will be displayed:
All maintenance resources busy; try again later
Output
For the following output example, the command "release pri-endpoint 22501" was 
entered. Assume that the PRI endpoint ports for extension 22501 are in cabinet 
1, carrier B, slot 20, circuit 1 to 6.
Feature Interactions
None.
release sp-link
This command will release the system printer link.
Port The port address (cabinet-carrier-slot-circuit) of the maintenance 
object that is being released.
Maintenance Name The type of maintenance object that is being released. The name 
for PRI endpoint port is "PE-BCHL."
Alt. Name The alternate way of identifying the maintenance object. This field 
contains the extension number of the PRI endpoint.
Result An indicator as to whether the object is successfully released. The 
possible values are: PASS, FAIL and ABORT.
Error Code A system-generated number that tells why the release failed or 
aborted. A detailed list of the codes can be in the 
"Busyout/Release Commands" section of this chapter.
 release pri-endpoint 22501 page 1 of 1
 COMMAND RESULTS
 Port Maintenance Name Alt. Name Result Error Code
 01B2001 PE-BCHL 22501 PASS
 01B2002 PE-BCHL 22501 PASS
 01B2003 PE-BCHL 22501 PASS
 01B2004 PE-BCHL 22501 PASS
 01B2005 PE-BCHL 22501 PASS
 01B2006 PE-BCHL 22501 PASS
 Command Successfully Completed










