User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123 
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids 
Page 8-268refresh spe-standby 
8
For the following output example, the command recycle carrier c was entered.
Feature Interactions
The ’a’ carrier can never have its power recycled. When the ’b’ carrier of the PPN 
contains SPE duplication hardware, the ’b’ carrier similarly is not available for 
power recycling.
If a port carrier is recycled, service is interrupted for that port carrier. If a carrier 
containing an active EI is recycled, communications with that cabinet will be 
disrupted. If a carrier containing an active tone-clock board is recycled, all ports 
port network will have service disrupted.
Occasionally, circuit packs show red LEDs and "NO BOARD" when a list 
configuration command is issued after a carrier is recycled. The test tdm 
command can be used to accelerate retirement of these problems.
refresh spe-standby
This command refreshes the memory of the standby SPE in a High or Critical 
Reliability System.
Port The port address (cabinet-carrier) of the maintenance object that is 
being tested. For this maintenance object, only the cabinet and carrier 
values are displayed.
Maintenance 
Name
The maintenance name will always be CARR-POW.
Alt. Name Not applicable.
Test Number The test number will always be 126.
Test Result An indicator as to whether the test passed, failed, or was aborted.
Error Code Further detail about the results of the test.
 recycle carrier c 
 TEST RESULTS
 Port Maintenance Name Alt. Name Test No. Result Error Code 
 01C CARR-POW 126 PASS 
 Command successfully completed 










