User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1681XXX-BD (Common Port Circuit Pack) 
10
Table 10-496. TEST #220 Neon Test 
Error 
Code
Test 
Result Description/ Recommendation
1004 ABORT The port was seized by a valid call during the test. The 
test has been aborted. Use the display port PCSSpp 
command to determine the station extension. Use the 
status station command to determine the service state 
of the port. If the service state indicates that the port is in 
use, then the port is unavailable for certain tests. (Refer 
to the "Status Commands" section in Chapter 8, 
‘‘Maintenance Commands and Trouble-Clearing Aids’’ 
for a full description of all possible states.) You must wait 
until the port is idle before retesting.
1. Retry the command at one-minute intervals a 
maximum of five times.
2. If the test continues to abort, escalate the problem.
1008 ABORT Could not allocate a ringing circuit. Either all the ringing 
circuits are in use, or the ringing generator is defective 
or is not wired correctly.
1. Retry the command at one-minute intervals a 
maximum of five times.
2. If the test continues to abort, look for RING-GEN 
errors in the Error Log. If an ABORT 1008 occurs for 
this test on other circuit packs as well, then the 
ringing generator may be defective or is not wired 
correctly (see errors for RING-GEN). If it doesn’t 
occur on port test 48 for ANL-16-L, then all four ring 
phases are in use.
3. If the test to continues to abort, escalate the 
problem.
Continued on next page










