User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1618UDS1-BD (UDS1 Interface Circuit Pack) 
10
1015 ABORT Ports on the UDS1 Interface circuit pack have not been 
busied out to out-of-service.
1. Enter the busyout board PCSS command to put all 
trunks or ports of the UDS1 Interface circuit pack 
into the out-of-service state. 
2. Retry the command. 
3. If the test continues to abort, escalate the problem.
1039 ABORT The UDS1 Interface circuit pack is providing timing for 
the system. Executing this test could cause major 
system disruption. If the UDS1 Interface circuit pack 
needs to be tested, set the synchronization reference to 
another DS1 Interface circuit pack or to the Tone-Clock 
circuit pack via the following command sequence:
1. Issue the disable synchronization-switch 
command.
2. Issue the set synchronization PCSS command. 
3. Issue the enable synchronization-switch 
command. Then rerun the test. If the test aborts 
again, a different ABORT error code will be 
generated. Follow the recommended maintenance 
procedures for that error code.
1950 ABORT Another loopback/span test is already executing on the 
DS1 boardor the board is in a network requested 
loopback mode (Line loopback or Payload loopback). 
The hardware error log will indicate whether a Customer 
Loopback Jack Test, Far CSU Loopback Test, or the 
One-Way Span Test is executing or if the board is in line 
loopback or payload loopback mode. Only one 
long-duration loopback/span test can be active at a 
given time. Thus, if a loopback/span test is already 
active, that test must be terminated via the 
test ds1-loop 
PCSS end-loopback/span-test
 command in order to 
execute this test.
Table 10-473. TEST #1213 Far CSU Loopback Test — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










