User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1466TIE-TRK (Tie Trunk) 
10
Tie Trunk Seizure Test (#73), Tie Trunk Dial Test 
(#747). Seizure Test(#73)
The Tie Trunk Seizure Test activates the M lead and checks for a response from 
the external end within 10 seconds. This test is applicable only to wink start and 
delay dial outgoing trunks. (For the TN2140 [G3iV2-386] circuit pack, the trunk 
must also be continuous-seize-ack and discontinuous-seize-ack).
PASS This test passed. Translation information was 
successfully updated on the circuit pack.
1. If signaling troubles are reported, verify translation 
information for this port.
(Non-TN439 and non-TN497 circuit packs only.) If the 
trunk is busied out, the test does not run, but it does 
return PASS.
To verify that the trunk is in-service:
1. Enter status trunk command to verify that the trunk 
is in-service.
If the trunk is in-service, no further action is necessary. If 
the trunk is out-of-service, continue to Step 2.
2. Enter release trunk command to put trunk back into 
in-service.
3. Retry the test command.
0NO 
BOARD
The test could not relate the internal ID to the port (no 
board).
1. Check to ensure that the board translations are 
correct. Translate the board, if necessary.
2. Issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board command. This should 
re-establish the linkage between the internal ID and 
the port.
Table 10-444. TEST #36 Audit Update Test — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










