User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1463TIE-TRK (Tie Trunk) 
10
7,
129, 
131, or 
133
(cont’d.)
FAIL
(cont’d.)
NOTE:
If the loop around and conference circuit test fails 
for all ports on a circuit pack, a -5 volt power 
problem is indicated. If a TN736 or TN752 power 
unit circuit pack is present, either the 631DB AC 
power unit or the 676B DC power unit may be 
defective. (The 631DB power unit is used in a 
medium cabinet powered by an AC source. The 
645B power unit is used in a medium cabinet 
powered by a DC power source.) The system may 
contain a TN736 or TN752 power unit circuit pack 
or a 631DB AC power unit, but not both types of 
power units. To investigate problems with a 631DB 
AC power unit, refer to the CARR-POW (carrier 
port power unit for AC-powered systems) 
Maintenance documentation. To investigate 
problems with a 645B DC power unit, refer to the 
CARR-POW (carrier port power unit for 
DC-powered systems) Maintenance 
documentation. If a red LED on TN736 or TN752 
power unit circuit pack is on, replace the pack.
If the test fails on more than 1 port, check for 
errors on the TONE-BD or the TONE-PT. If errors, 
take appropriate actions. When the tone errors are 
cleared, rerun the test. If the test fails again, see 
FAULT ISOLATION above.
PASS Tie trunk Loop Around and Conference Test is 
successful. This port is functioning properly.
1. If users are reporting troubles, examine loop 
connections to the port.
Table 10-443. TEST #33 Loop Around and 
Conference Circuit Test  — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










