User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1166PR-MEM (TN790 RISC Memory) 
10
Error Log Entries and Test to Clear Values
Notes:
a. This error (3) indicates that a software patch has been applied and either 
the software patch is bad or was installed incorrectly.
1.Back out the software patch and run the test memory UUCS long 
command to verify that the problem has been cleared.
2.If the PBX system is equipped with High Reliability or Critical Reliability 
option (i.e. with duplicated SPEs), and this error occurs, a SPE 
interchange will occur if the health of the standby SPE permits the 
interchange.
b. The following Aux Data indicate SIMM Failures
1.SIMM A
2.SIMM B
3.SIMM A & SIMM B
4.SIMM C
5.SIMM A & SIMM C
6.SIMM B & SIMM C
7.SIMM A, SIMM B, & SIMM C
1. Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the 
appropriate test description and follow the recommended procedures.
Table 10-351. Memory Error Log Entries
Error 
Type Aux Data Associated Test
Alarm 
Level
On/Off 
Board Test to Clear Value
0
1
0 Any Any Any test memory a/b l r 1
1 Any Flash Memory 
Checksum Test (#86)
MAJOR ON test memory a/b l r 5
3(a) Any Flash Memory 
Checksum Test (#86)
MAJOR ON test memory a/b l r 5
1025 Any Memory Parity Error 
Detection Test (#87)
MINOR ON test memory a/b r 3
1281 Any Memory Burst Read 
Test (#908)
MAJOR ON test memory a/b l r 2
1793 Any (b)(c) Read All Memory (#85) MAJOR ON test memory a/b l r 1
2049(d) Any (b)(c) Memory Functional 
Test (#332)
MAJOR ON test memory a/b l r 1










