User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1046PI-BD (Processor Interface Circuit Pack) 
10
!
WARNING:
The "test interface long" command resets the PI-BD and cause all ISDN-PRI 
and BX.25 links to come down.
Notes:
a. Indicates the circuit pack totally stopped functioning or it was physically 
removed from the system.
NOTE:
The alarm is logged about 11 minutes after the circuit pack has been 
removed and/or SAKI Test (#53) fails.
If the circuit pack is not in the system, insert a circuit pack (in the same 
slot as the error indicates) to resolve this error. Or, if the circuit pack is in 
the system and the red LED is on, then replace the circuit pack.
!
CAUTION:
Reseating the circuit pack may cause a system restart if the circuit 
pack is located on an Active SPE complex.
1. Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the 
appropriate test description and follow the recommended procedures.
769 (h) 4358 None
1025 (i) 4363 NPE Audit Test (#50) test interface PCS sh
1538 (j) Any None MINOR ON
3585 (d) Any None Test (#423) MAJOR ON reset interface PCS l
3840 (i) Any None
3841 Any Standby PI Circuit 
Pack Test (#423)
MAJOR ON test interface PCS sh
3999(k) Any None
Table 10-302. PI-BD Error Log Entries  — Continued
Error 
Code
Aux 
Data Associated Test
Alarm 
Level
On/Off 
Board Test to Clear Value
Continued on next page










