User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-974M/T-DIG (Maintenance/Test Digital Port) [G3iV1-1.286, G3iV2-386] 
10
Table 10-281. TEST #161 Loop Around Test 
Error 
Code
Test 
Result Description/ Recommendation
1000 ABORT One of the Maintenance/Test Digital Ports is busy with 
background maintenance.
1. Either wait for the port to become idle, or busyout both 
Maintenance/Test Digital Ports on the 
Maintenance/Test circuit pack via the busyout port 
PCSS02 and busyout port PCSS03 commands, 
respectively.
2. Release the ports (if they were busied out) via the 
release port PCSS02 and release port PCSS03 
commands, respectively.
3. Retry the command at one-minute intervals a 
maximum of five times.
4. If the test continues to abort, escalate the problem.
1002 ABORT The system could not allocate time slots for the test. The 
system may be under heavy traffic conditions, or it may 
have time slots out-of-service due to TDM-BUS errors. 
Refer to the TDM-BUS Maintenance documentation to 
diagnose any active TDM Bus errors.
1. If the system has no TDM-BUS errors, and if not 
handling heavy traffic, repeat the test at one-minute 
intervals a maximum of five times.
2. If the test continues to abort, escalate the problem.
1004 ABORT The port was seized by a valid ISDN-PRI Test Call. Use 
the list isdn-testcall command to determine which call is 
using the port (from the M/T Port column). Either wait for 
the test call to complete (as indicated in the Start Time 
and Duration fields of the above display), or abort the test 
call with the clear isdn-testcall tg/mem command, where 
tg/mem is determined from the B-channel field of the 
above display.
Continued on next page










