User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-897MET-LINE (MET Line) 
10
MET Line Station Lamp Updates Test (#60)
For this test, the software lights the lamps on the terminal based on the status 
record contained in the processor. The lamp updates run only if the station is 
in-service.
0NO 
BOARD
The test could not relate the internal ID to the port (no 
board). This could be due to incorrect translations, no 
board is inserted, an incorrect board is inserted, or an 
insane board is inserted.
1. Check to ensure that the board translations are 
correct. Use the list config command, and resolve 
any problems that are found.
2. If the board was found to be correctly inserted in 
step 1, issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board long command. This should 
re-establish the linkage between the internal ID and 
the port. If this is not the case, check to ensure that 
there is a valid board inserted.
Table 10-255. TEST #57 MET Circuit and Conference Circuit Test — 
Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










