User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123 
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-753HYB-LINE (Hybrid Line) 
10
Hybrid Line Local Digital Loop Around Test (#58)
This test checks the control channel between the SPE and the port’s digital 
circuitry. The SPE sends transparent data to the on-board microprocessor and 
compares the data echoed back. This test is repeated three times.
PASS Hybrid Circuit and Conference Circuit Test passed. The 
hybrid circuitry is transmitting properly.
1. If complaints still exist, investigate by using other 
port tests, and by examining the station, wiring, and 
connections.
0NO 
BOARD
The test could not relate the internal ID to the port (no 
board). This could be due to incorrect translations, no 
board is inserted, an incorrect board is inserted, or an 
insane board is inserted.
1. Check to ensure that the board translations are 
correct. Use the list config command, and resolve 
any problems that are found.
2. If the board was found to be correctly inserted in 
step 1, issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board long command. This should 
re-establish the linkage between the internal ID and 
the port. If this is not the case, dispatch to check to 
ensure that there is a valid board inserted.
Table 10-209. TEST #57 Hybrid Circuit and Conference 
Circuit Test — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










