User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123 
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-703EXP-INTF (Expansion Interface Circuit Pack) 
10
Expansion Interface Link Switch Command
This action is potentially destructive.
The Expansion Interface switch command enables system technician to choose 
which set of Expansion Interface Links should be the Active link when duplicate 
Expansion Interface Links are available.
The command line entry is set expansion-link PCSS, where PCSS is the 
Expansion Interface address of 
either
 Expansion Interface circuit pack on the 
FAIL
(cont’d.)
PROCEDURE C
Use Procedure C if the Expansion Interface circuit pack to be tested 
is part of any link from EPN to EPN.
1. Test the Packet Control circuit pack. If the Packet Control circuit 
pack fails any tests, refer to the PKT-CTRL Maintenance 
documentation for recommended maintenance procedures.
2. If all Packet Control circuit pack tests pass, the failure may be in 
the Expansion Interface circuit packs of the EPN to EPN link or on 
the EPN Packet Bus.
3. Issue the test board PCSS long command on both EPN to EPN 
Expansion Interface circuit packs and follow the procedures for 
Test #242.
PASS The data packet was received correctly.
1. Refer to other Expansion Interface circuit pack tests if the 
Expansion link is not functioning correctly.
0NO 
BOARD
No board was detected by the test.
1. Check the error log for wrong board (error 125) or no board (error 
131). Resolve either of these issues, if applicable.
2. Check that the board is properly translated and inserted. If so, 
check for hyperactivity (error 1538). If hyperactive, use the reset 
board PCSS command.
3. Run the test again. If it fails, the ID chip on board may be bad. 
Replace the board and retest.
Table 10-198. TEST #589 Expansion Interface Packet Interface Test 
 — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










