User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123 
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-702EXP-INTF (Expansion Interface Circuit Pack) 
10
FAIL
(cont’d.)
PROCEDURE B
Use Procedure B if the Expansion Interface circuit pack to be tested 
is in an EPN and is part of a Standby link from the PPN to the EPN or if 
the Expansion Interface circuit pack to be tested is in the PPN.
1. Test the Packet Control circuit pack. If the Packet Control circuit 
pack fails any tests, refer to the PKT-CTRL Maintenance 
documentation for recommended maintenance procedures.
2. If all Packet Control circuit pack tests pass, the failure may be in 
either the PPN Expansion Interface circuit pack or the connected 
EPN Expansion Interface circuit pack. If the circuit pack being 
tested is in the PPN and is part of an Active link from the PPN to 
the EPN and if a duplicate Expansion link exists, make that the 
Active link, using the set expansion-link PCSS command. 
Execute the test board long command on the original PPN 
Expansion Interface circuit pack and the connected EPN 
Expansion Interface circuit pack and follow the procedures for 
Test #242. Otherwise, if a duplicate link does not exist, run the 
Long Test Sequence on the PPN Expansion Interface circuit pack. 
If Test #242 fails, follow the procedures for Test #242. If Test #242 
passes, the fault is in the connected EPN Expansion Interface 
circuit pack.
3. If the test was not run on an active PPN Expansion Interface 
circuit pack, issue the test board PCSS long command on both 
Standby Expansion Interface circuit packs and follow the 
procedures for Test #242.
More information follows.
Table 10-198. TEST #589 Expansion Interface Packet Interface Test 
 — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










