User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123 
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-314CO-DS1 (DS1 CO Trunk) 
10
Conference Circuit Test (#7)
One or more Network Processing Elements (NPEs) reside on each circuit pack 
with a TDM Bus interface. The NPE controls port connectivity and gain, and 
provides conferencing functions on a per-port basis. The Conference Circuit Test 
verifies that the NPE channel for the port being tested can correctly perform the 
conferencing function. The NPE is instructed to listen to several different tones 
0NO 
BOARD
The test could not relate the internal ID to the port (no 
board). This could be due to incorrect translations, no 
board is inserted, an incorrect board is inserted, an 
insane board is inserted, or the board is hyperactive 
(see note below).
1. Check to ensure that the board translations are 
correct. Use the list config command, and resolve 
any problems that are found.
2. If the board was found to be correctly inserted in 
step 1, issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board long command. This should 
re-establish the linkage between the internal ID and 
the port. If this is not the case, dispatch to check to 
ensure that there is a valid board inserted.
NOTE:
Hyperactivity causes some special problems with 
the sequence suggested above. If the ports are 
translated after issuing the list config command 
but the ’Vintage’ field reports that there is no board 
(when there really is a board), then the busyout 
board and the release busy board commands 
will not work (even though the reset board 
command will work). The software will put the 
hyperactive board back in service after the 
hyperactivityclears.
Table 10-88. TEST #6 NPE Crosstalk Test  — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page