Maintenance Object Repair Procedures 
Page 10-293CARR-POW (Carrier Port Power Unit) for DC-Powered Systems 
10
1130 ABORT Only occurs when recycling carrier 2B. Indicates 
that the Active Expansion Interface Link for the 
EPN is in carrier 2B.
1. Issue the set expansion-link A01 command.
2. Rerun the test.
2000 ABORT Response to the test request was not received 
within the allowable time period.
2029 ABORT Internal System Error.
1. Retry the command at one-minute intervals a 
maximum of five times.
2. If the test continues to abort, escalate the 
problem.
1 (Carrier E) 
2 (Carrier D) 
4 (Carrier A) 
8 (Carrier B) 
16 (Carrier C)
FAIL There is a problem with one or both port carrier 
power units on the recycled carrier.
1. Since the Power Unit Recycle Test failed, both 
port carrier power supplies in the recycled 
carrier should have been powered off by the 
system software. Both port carrier power units 
should be showing a red status LED, instead 
of a green one. Since the Power Unit Query 
Test is a subset of the Power Unit Recycle 
Test, the Power Unit Query Test (#127) should 
also fail. Run the Power Unit Query Test by 
using the test environment P command 
where P is the appropriate port network 
number.
2. If the test fails, follow the repair procedures 
described for Test #127. If the problem 
persists, follow normal escalation procedures.
Table 10-84. TEST #126 Power Unit Recycle Test — Continued
Error Code
Test 
Result Description/ Recommendation
Continued on next page