User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123 
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-210BRI-SET, ASAI-ADJ, BRI-DAT 
10
Table 10-68. TEST #628 BRI XID 
Error 
Code
Test 
Result Description/ Recommendation
1000 ABORT The BRI-SET, ASAI-ADJ, ATT-ADJ, LGATE-AJ, ATTE-AJ 
is busy. The test cannot be executed at this time:
1. Pause momentarily (30 seconds) and re-execute at 
this time.
2. If this problem persists, escalate this problem.
NOTE:
A BRI-PORT can also be busy. When using this for 
BRI-PORT/ABRI-PORT tests, the words "BRI-SET, 
ASAI-ADJ, ATT-ADJ, " can be changed to 
"BRI-PORT, ABRI-PORT, ATT-ADJ."
1005 ABORT The endpoint is not administered to support XID Testing.
1. If the endpoint documentation reflects support XID 
testing, use the change station extension 
command to change the XID Testing? field on the 
form to "yes."
1113 ABORT The signaling link between the switch and the endpoint 
is down.
1. Use the test port PCSSpp l command to clear any 
errors which prevent establishment of the signaling 
link.
2. Examine the results of the Signaling Link Status Test 
(#626) which is run as part of this command. If this 
test aborts or fails, follow the repair procedure for 
Test #626.
3. If the XID test continues to abort, escalate the 
problem.
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long 
PCSSpp command, and review the results of the 
BRI Port Local LAN Loop Around Test to verify the 
repair.
Continued on next page










