User Guide
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si 
555-230-123 
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-203BRI-SET, ASAI-ADJ, BRI-DAT 
10
2100 ABORT Could not allocate the necessary system resources to 
run this test.
1. Retry the command at one-minute intervals a 
maximum of five times.
2. If the test continues to abort, escalate the problem.
1113 FAIL The signaling link is not "bound" to the adjunct or 
endpoint. For BRI endpoints supporting MIM 
initialization, this error indicates that the endpoint has 
not been bound to a signaling link (that is, SPID 
initialization has not been completed). Since the 
signaling link associated with the endpoint is not 
identified until SPID initialization completes, this error 
does not imply that the signaling link is connected or 
disconnected at Layer 2 nor does it provide the status of 
TEI assignment for the endpoint. For ASAI adjuncts and 
BRI endpoints not supporting MIM initialization, this error 
indicates that the link is disconnected at Layer 2. Since 
the signaling link associated with the endpoint has been 
identified via administration, the link is only "unbound" 
from the endpoint when it is disconnected.
1. Execute the status bri-port PCSSpp command and 
refer to the associated procedures for this command 
contained in the BRI-PORT (ISDN-BRI Port) 
Maintenance documentation.
2. If the test continues to fail, escalate the problem.
PASS The signaling link is connected at Layer 2 and "bound" 
to the BRI endpoint or ASAI adjunct.
Table 10-66. TEST #626 Signaling Link Status Test — Continued
Error 
Code
Test 
Result Description/ Recommendation
Continued on next page










