User's Manual

DEFINITY ECS Release 8.2 Maintenance for R8.2csi
555-233-119 Issue 1
April 2000
Maintenance Commands
2-339test environment
2
Feature Interactions
The long test recycles power in some specified cabinet on non-SPE and
maintenance board carriers and is destructive. Specifically, the ’a’ carrier
of PPNs does not have power recycled.
All port carriers are recycled, and service is interrupted for each port
carrier.
If a carrier containing an active tone-clock board is recycled, all ports in
the cabinet or port network will have service disrupted.
Output
The following example shows the output for the
test environment 1
command to
test a PPN cabinet. The responses display on a test-by-test basis with one line of
data for each test result.
Field descriptions
Port
Port address (cabinet-carrier)
Maintenance
Name
The name of maintenance object
Alt. Name
Not applicable
Test No.
The test being executed.
Result
Test result: Pass, Abort, Fail, Disabled
Error Code
Numeric code explaining why the release failed or aborted. Refer
to the detailed list of the codes by test number for each MO.
test environment 1
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01 CABINET 122 PASS
01 EMG-XFER 124 PASS
01 EXT-DEV 120 PASS
01 EXT-DEV 120 PASS
01 RING-GEN 117 PASS
01 RING-GEN 118 PASS
Command Successfully Completed