User manual
DEFINITY ECS Release 8.2 Maintenance for R8.2csi 
555-233-119  Issue 1
April 2000
Maintenance Objects 
3-316BRI-SET, ASAI-ADJ, BRI-DAT 
3
administered port address for the endpoint or adjunct under test, the test passes 
(see Service SPID Display which follows). If after one minute nothing is displayed 
on the test set, the test fails.
The abbreviations used in (Service SPID Display) have the following meanings:
Table 3-138. SPID Facility Test
Test 
Result Description/ Recommendation
FAIL No response is received from the endpoint.
1. Check the physical wiring between the switch and the endpoint or adjunct.
FAIL Display does not match administered port address for the endpoint or adjunct.
1. Change station administration for endpoint or adjunct to match displayed port 
address.
PASS Display matches administered port address for the endpoint or adjunct.
For BRI endpoints:
1. Verify that the SPID values administered in the switch and the endpoint are 
consistent.
2. If the SPID values are correct, replace the endpoint.
For ASAI adjuncts:
1. Verify that the TEI values administered in the switch and the adjunct are 
consistent.
2. If the TEI values are correct, consult the recommended repair procedures of the 
manufacturer for the adjunct.
Continued on next page
P port network (1,2, ...)
C Carrier (A,B,C, ...)
SS Slot (01, 02, ...)
pp port (01-12)
ext extension one and two (one through 99999)
SPID service order profile identifier










