User manual
DEFINITY ECS Release 8.2 Maintenance for R8.2csi 
555-233-119  Issue 1
April 2000
Maintenance Commands 
2-372test sp-link 
2
Feature Interactions
Additional data is available after running a test. See the 
status signaling-group
command for how to access the additional data.
Output
The following output example is for the 
test signaling-group 1
 command. The 
responses display on a test-by-test basis with one line of data for each test result.
Field descriptions
test sp-link
The test sp-link command validates that the system printer link is administered 
and runs a series of diagnostic tests that return results of the test along with 
possible error codes.
The system printer link is a link from the switch to an external printer over which 
jobs can be printed. This link is created by administering the system printer 
extension and setting up a call to the system printer.
Port
The signaling group number (1-8) of the signaling group that is 
being tested.
Maintenance 
Name
The type of maintenance object that is being tested.
Alt. Name
Not Applicable.
Test No
Test being executed
Result
Test result: Pass, Abort, Fail, No Board, Disabled, Extra Bd.
Error Code
Numeric code explaining why the release failed or aborted. Refer 
to the detailed list of the codes by test number for each MO.
 test signaling-group 1 SPE A
 TEST RESULTS
 Port Maintenance Name Alt. Name Test No. Result Error Code
 1 ISDN-SGR 636 PASS
 1 ISDN-SGR 639 PASS
 1 ISDN-SGR 637 PASS
 Command Successfully Completed










