User manual
DEFINITY ECS Release 8.2 Maintenance for R8.2csi 
555-233-119  Issue 1
April 2000
Maintenance Commands 
2-190release pri-endpoint 
2
release pri-endpoint
This command removes PRI endpoint ports (B-channels) associated with 
specified PRI endpoint from maintenance busy states. Periodic and scheduled 
tests resume on released ports. The switch attempts to negotiate with the far-end 
PRI terminal adapter activating PRI endpoint port (B-channel). Maintenance 
does background initialization testing on released ports. For details of the test 
sequence, refer to [3].
Output
The following example shows the output from the 
release pri-endpoint 22501
command and assumes that the PRI endpoint ports for extension 22501 are in 
cabinet 1, carrier B, slot 20, circuit 1 to 6.
Field descriptions
Action/Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
release 
pri-endpoint
extension
extension number associated with 
desired PRI endpoint. 
init
inads
craft
nms
none none
Port
Port address (cabinet-carrier-slot-circuit) of released maintenance object.
Maintenance Name
PE-BCHL.
Alt. Name
Alternate way to identify maintenance objects. (PRI endpoint extension)
Result
Success status of a busied out object (PASS, ABORT, FAIL)
Error Code
System-generated description of a command failure.
 release pri-endpoint 22501 page 1 of 1
 COMMAND RESULTS
 Port Maintenance Name Alt. Name Result Error Code
 01B2001 PE-BCHL 22501 PASS
 01B2002 PE-BCHL 22501 PASS
 01B2003 PE-BCHL 22501 PASS
 01B2004 PE-BCHL 22501 PASS
 01B2005 PE-BCHL 22501 PASS
 01B2006 PE-BCHL 22501 PASS
 Command Successfully Completed










