User manual
DEFINITY ECS Release 8.2 Maintenance for R8.2csi 
555-233-119  Issue 1
April 2000
Maintenance Commands 
2-120list measurements clan ppp 
2
■ High Cyclic Redundancy Check (CRC)—detects and corrects errors on 
every frame) errors could suggest that the connection may be “noisy”
The 24-hour history gives the ability to look back at these measures if the trouble 
cleared.
Data is retrieved for 15-minute intervals for 24 hours for CRC, Invalid Frame and 
Chap Failures for PPP connections. If the data cannot be retrieved for the 15 
minute interval, 
N/A
 displays in the field. The delta (the change from the last 
inquiry) and the total are provided for each error count. After the occurrence of 
an “N/A,” the delta equals the total.
Output
The following example shows the output from the 
list measurements clan ppp 
command.
Action/Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
list 
measurements
clan ppp
UUCCSS
pp
print
schedule
Link identifier (primary 
or secondary)
Port Address
Report sent to printer
Command is validated 
and then a scheduling 
form displays to 
schedule execution of 
the command. The 
command is then 
placed in the 
command queue and 
is executed at the 
specified time. The 
information displayed 
by the command is 
sent to the system 
printer instead of the 
screen.
1
Examples:
list measurements 
clan ppp
list measurements 
1 Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
customer
Primary










