User manual
DEFINITY ECS Release 8.2 Maintenance for R8.2csi 
555-233-119  Issue 1
April 2000
 Maintenance Objects
3-1274VC-SUMPT 
3
Notes:
a. This port has been busied out with the 
busyout port PCSSpp
 command.
b. The circuit pack has been removed or has been insane for more than 11 
minutes. To clear the error, replace or reinsert the circuit pack.
c. The NPE Crosstalk Test(#1103) failed.
d. The VC Summer Port Local TDM Loopback Test(#1100) failed.
System Technician-Demanded Tests: Descriptions 
and Error Codes
Always investigate tests in the order presented in the table below. By clearing 
error codes associated with the 
TDM Loopback Test, for example, you may also 
clear errors generated from other tests in the testing sequence.
NPE Crosstalk Test (#6)
This test is destructive.
The NPE Crosstalk test verifies that this port’s NPE channel talks on the selected 
time slot and never crosses over to time slots reserved for other connections. If 
the NPE is not working correctly, one-way and noisy connections may be 
observed. This test is part of the port’s long test sequence and takes 
approximately 20 to 30 seconds to complete.
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence D/ND
1
1. D = Destructive; ND = Nondestructive
NPE Crosstalk Test (#6) (a) X D
TDM Loopback Test (#1100) X X D