User manual
DEFINITY ECS Release 8.2 Maintenance for R8.2csi 
555-233-119  Issue 1
April 2000
Maintenance Objects 
3-596DS1-BD (DS1 Interface Circuit Pack) 
3
CSU Equipment Loopback Test (#1210)
This test is destructive.
The CSU Equipment Loopback (ELB) Test causes a loopback at the near-edge of 
the local 120A CSU Module or T1 Sync Spilitter, and tests the connection from the 
TN767E DS1 board to the CSU Module/T1 Sync Splitter (DS1 board edge 
interconnecting cable, and CSU Module/T1 Sync Splitter edge). This test will only 
be performed if the 120A CSU Module/T1 Sync Splitter is present, administered, 
and connected to a 1.544Mbps TN767E DS1 circuit pack on the back of the port 
carrier.
The test is destructive and can only be initiated by a system technician 
demanded 
test ds1-loop UUCSS ds1/csu-loopback-tests
 command. 
All trunks or ports on the DS1 Interface circuit pack must be busied out via the 
system technician 
busyout board
 command before running the ELB Test.
When the ELB Test is initiated, maintenance software sends an appropriate 
message to the TN767E DS1 Interface circuit pack to start the test. The board 
sets up the ELB loopback, transmit a test pattern, and verify that the pattern is 
received unaltered through the loopback. If the transmitted and received pattern 
is different, the test fails.
0NO 
BOARD
The test could not relate the internal ID to the port (no board). 
This could be due to incorrect translations, no board is inserted, an incorrect 
board is inserted, or an insane board is inserted.
1. Check to ensure that the board translations are correct. Use the add ds1 
UUCSS command to administer the DS1 interface if it is not already 
administered.
2. If board was already administered correctly, check the error log to 
determine if the board is hyperactive. If this is the case, the board is shut 
down. Reseating the board will re-initialize the board.
3. If the board was found to be correctly inserted in step 1, issue the busyout 
board command.
4. Issue the reset board command.
5. Issue the release busy board command.
6. Issue the test board long command.
This should re-establish the link between the internal ID and the port.
Table 3-248. TEST #1209 DS1 Board Loopback Test — Continued
Error 
Code
Test  
Result Description/ Recommendation
Continued on next page










