User manual
DEFINITY ECS Release 8.2 Maintenance for R8.2csi 
555-233-119  Issue 1
April 2000
Maintenance Objects 
3-466DID-DS1 (DS1 DID Trunk) 
3
Conference Circuit Test (#7)
One or more NPEs reside on each circuit pack with a TDM Bus interface. The 
NPE controls port connectivity and gain, and provides conferencing functions on 
a per-port basis. The Conference Circuit Test verifies that the NPE channel for the 
port being tested can correctly perform the conferencing function. The NPE is 
instructed to listen to several different tones and conference the tones together. 
The resulting signal is then measured by a Tone Detector port. If the level of the 
tone is within a certain range, the test passed.
0NO 
BOARD
The test could not relate the internal ID to the port (no board). This could 
be due to incorrect translations, no board is inserted, an incorrect board is 
inserted, or an insane board is inserted.
1. Check to ensure that the board translations are correct. Use the lIst 
config command and resolve any problems that are found.
2. If the board was found to be correctly inserted in step 1, issue the 
busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board long command. This should re-establish the 
linkage between the internal ID and the port. If this is not the case, 
check to see that there is a valid board inserted.
Table 3-197. TEST #6 NPE Crosstalk Test — Continued
Error 
Code
Te s t 
Result Description/ Recommendation
Continued on next page










