User's Manual
Table Of Contents
- ===============================
- MAIN MENU
- MASTER INDEX
- GLOSSARY
- ===============================
- DEFINITY® ECS Release 8.2 Administration for Network Connectivity
- Contents
- Preface
- 1 Networking Overview
- 2 H.323 Trunks
- Overview
- H.323 Trunk Administration
- Enabling Administration
- H.323 Trunk Administration — Task Summary
- H.323 Trunk Administration — Task Detail
- Task 1 — Assign Node Names
- Task 2 — Define IP Interfaces
- Task 3 — Assign Link via ethernet Data Module to the LAN
- Task 4 — Create a signaling group
- Task 5 — Create a trunk group
- Task 6 — Modify signaling group
- Task 7 — Specify codecs
- Troubleshooting IP Solutions
- 3 C-LAN Administration
- Overview
- Configuration 1: R8r <—ppp—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 2: R7r (+CMS) <—ethernet—> R7csi
- Task Summary
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Define IP Interfaces
- Switch 2 Task— Assign Link via ethernet Data Module to the LAN
- Switch 2 Task — Assign IP Route (to Switch 1)
- Switch 2 Task— Assign Processor Channels
- Intuity System Administration
- Administer Subscribers
- Worksheet A: Names and IP Addresses for Lucent Intuity System
- Worksheet B: LAN Data for the Lucent Intuity System
- Enable links and processor channels
- Configuration 3:R8si<—x.25 —> R8r Gateway <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign pdm Data Module
- Switch 1 Task — Assign Link via x.25 Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Assign Link via procr-intf Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 3 Task — Assign Node Names
- Switch 1 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 4: R8csi <—ISDN—> R8si Gateway <—ppp—> R8csi
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 3
- Switch 1 Task — Assign Processor Channels
- Switch 1 Task — Assign Signaling Group and administered NCA TSC
- Switch 1 Task — Assign ISDN-TSC Gateway
- Switch 2 Task — Assign Signaling Group and administered NCA TSC
- Switch 3 Task — Enable Bus Bridge Connectivity
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign Link via ppp Data Module to Switch 1
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 5A: R8csi <—ppp—> R8r (one C-LAN) <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to Ethernet
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 2 Task — Assign IP Route to node-3
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 5B:R8csi <—ppp—> R8r (2 C-LANs) <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Link via ppp Data Module to C-LAN(a)
- Switch 1 Task — Assign Link via ppp Data Module to C-LAN(b)
- Switch 1 Task — Assign Processor Channels
- Switch 1 Task — Assign IP Route: C-LAN(a) to node-3
- Switch 1 Task — Assign IP Route: C-LAN(b) to node-2
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 2 Task — Assign IP Route to node-3
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- 4 Networking Example
- A Screens Reference
- Networking Screens
- Other Network-Related DEFINITY Screens
- Networking Screens
- Node Names
- page 1
- Pages 2 – 6
- IP Interfaces
- IP Routing
- IP Media Parameters
- Data Module Screens
- Common Data Module Fields
- Data Module — Type ethernet
- Data Module — Type ppp
- Data Module — Type procr-intf (used for BX.25 connections with the si model)
- Data Module - type X.25 (used for BX.25 connections with the r model)
- Data Module - type pdm (used for BX.25 connections with the r model)
- Communication-Interface Processor Channel
- Circuit Packs
- Signaling Group
- ISDN TSC Gateway Channel Assignments
- Other Networking-Related DEFINITY Screens
- Communication Interface Links
- Data Module - type netcon
- Data Module - type analog-dm
- Extended Trunk Access Call Screening
- Extension Number Portability Numbering Plan
- Hop Channel Assignments Screen
- Implementation notes
- Node Number Routing
- Message Waiting Indication Subscriber Number Prefixes
- Synchronization Plan
- Pages 1–X of the screen
- Uniform Dial Plan
- B Private Networking
- Contents of this Appendix
- Distributed Communications System
- Description of DCS
- DCS Features
- Italian DCS Protocol
- ISDN/X.25 gateway
- DCS Over ISDN-PRI D-channel
- DCS feature considerations
- DCS Interactions
- Example DCS configurations
- Centralized Attendant Service
- Extended Trunk Access
- Extension Number Portability
- Inter-PBX Attendant Service
- Private Network Access
- Uniform Dial Plan
- ISDN Feature Plus
- QSIG
- Centralized Voice Mail Via Mode Code
- Japan TTC Q931-a Private Networking Protocols
- C Security Issues
- D Capacities and Performance
- E C-LAN Installation
- F IP Trunk Installation and Administration
- IP Trunk Installation
- IP Trunk Administration
- Procedures for Extension Dialing Between Sites
- DCS over IP Trunk
- DCS or Dedicated Trunks to Specific Locations Configurations
- Rerouting calls when IP transmission quality is poor
- Placing a test telephone call
- Setting up alerts on IP trunks
- Alert types
- Viewing error messages
- Troubleshooting IP trunk
- Maintaining the performance of the IP trunk server
- Configuring Microsoft NetMeeting™ on a PC
- IP Trunk Worksheets
- G References
- Glossary
- Index

D Index
493
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000 CID: 77730
Centralized Attendant Service (CAS) feature,
interactions, (continued)
Call Forwarding 341
DCS Alphanumeric Display for Terminals 325
Distributed Communications System (DCS) 342
DTGS buttons 342
DXS buttons 342
Emergency Access to Attendant 342
Hunt Groups 342
Inter-PBX Attendant Service (IAS) 348
Leave Word Calling (LWC) 342
Night Service 342
nonattendant consoles 342
queues 339
release link trunks (RLT) 339
remote hold 339
changing
audio settings on Microsoft NetMeeting
446
channel service unit (CSU) 478
circuit packs 4
C-LAN 5
DS1 208, 228, 233
per system 10
Circuit Packs form
implementation notes
301
Circuit Packs screen 277
C-LAN 5
cables 415
installation 414
pinouts 416
testing 414
C-LAN circuit pack 413
Class of Restriction (COR) feature
interactions
Enhanced DCS (EDCS)
329
QSIG Message Waiting Indication 384
Class of Service (COS) feature
interactions
QSIG Message Waiting Indication 384
CMS
LAN Setup Summary
59
codecs, specify 49
common control switching arrangements (CCSA) 349
communications-interface processor channel screen 273
communiucations interface links screen 293
Configuration manager
performing backups
425
Configuration Manager, IP Trunk 426
configuring
Microsoft NetMeeting
445
confirming the number of available ports on IP trunks
426
connecting switches 1
connection
types
9
connection types 1, 6, 9
connectivity
switch
4
country protocol options 320
coverage answer groups 326
Coverage Callback feature
interactions
DCS Call Coverage
326
DCS Call Forwarding 327
D
D channel 490
D-channel backups
DCS Over ISDN–PRI D-Channel (DCS+)
328
Data Call Setup feature
interactions
Extended Trunk Access (ETA) 345
QSIG Additional Network Feature Path
Replacement (ANF–PR)
381
data module
example
219, 225
data module screen 256
analog-dm 297
netcon 295
data module, assign 42
Data Privacy feature
interactions
DCS Call Waiting 327
QSIG Additional Network Feature Path
Replacement (ANF–PR)
381
Data Restriction feature
interactions
DCS Call Waiting
327
QSIG Additional Network Feature Path
Replacement (ANF–PR)
381
DCS 2
IP Trunk 436
DCS Alphanumeric Display for Terminals feature 313,
323
interactions
Attendant Call Waiting
325
Call Coverage 325
Call Forwarding 325
Call Park 325
Call Pickup 325
Centralized Attendant Service (CAS) 325
ISDN–PRI 325
DCS Attendant Control of Trunk Group Access feature
313, 323
interactions
DCS Attendant Display
325
DCS Automatic Callback (ACB) 326
Uniform Dial Plan (UDP) 325